China OEM RV Series Customized Worm Gearbox with Output Shaft double worm gearbox

Solution Description

RV series Qualities

  • RV – Dimensions:–150
  • Input Choices: with input shaft, With Sq. flange,With Enter Flange
  • Enter Energy .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and more than 110 in cast iron
  • Ratios amongst 5 and a hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are provided full with synthetic oil and permit for universal mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are obtainable with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, lower/high temperature oil, filling/drain/breather/stage plug,Small hole

Simple versions can be utilized to a vast range of energy reduction ratios from 5 to one thousand.
Guarantee: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Selection:
Variety Aged Type Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

Starshine Drive

ZheJiang CZPT Generate Co.,Ltd,the predecessor was a state-owned mould enterprise, was recognized in 1965. CZPT specializes in the comprehensive electrical power transmission solution for high-conclude gear production industries based on the purpose of “Platform Item, Software Design and style and Expert Service”.
Starshine have a robust technological power with over 350 personnel at current, which includes in excess of 30 engineering experts, thirty good quality inspectors, masking an area of 80000 square CZPT and types of sophisticated processing devices and screening equipments. We have a very good foundation for the industry software improvement and support of high-finish speed reducers & variators proudly owning to the provincial engineering technologies investigation centre,the lab of equipment velocity reducers, and the foundation of modern day R&D.

Our Staff

Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

Application: Motor, Machinery
Hardness: Hardened Tooth Surface
Installation: 90 Degree
Layout: Corner
Gear Shape: Worm and Worm Wheel
Step: Single-Step
Customization:
Available

|